Installation determines whether a system delivers its designed performance. Geometry, support, water management and interfaces are controlled as carefully as the system and glass.

Large-format glazing requires planned logistics, safe lifting and the correct sequence of work.

SITE PROCESS

Installation as an engineering stage.

01

Base preparation

We verify geometry, structural capacity, levels and installation gaps.

02

Thermal bases

Thermally broken support profiles and low-threshold details are used where required.

03

Waterproofing

Interfaces with terraces, façades and roofs are coordinated with membranes and drainage.

04

Glass lifting

Vacuum lifters and cranes are planned around glass weight, dimensions and access.

05

Adjustment

After installation we check sash movement, compression, locks, gaskets and drainage.